Licensed & tailored for your ecommerce business

Turn your product catalog into a visual AI sales advisor

RESURFAiCE is licensed and custom-integrated into your ecommerce website. We tailor the product selection, visual experience, branding, and conversion actions around your catalog and customer journey.

Curate Your Catalog
Tailor Your Brand
Install On Your Website
The Resurfaice journey

A photo-led sales assistant for surface catalogs

RESURFAiCE acts as an active sales guide. By recommending the best-fit materials directly within a customer's project photo, it turns passive catalog browsing into high-intent sample requests and quotes.

Illustrative bathroom before renovation with dated brown floor tiles
Illustrative bathroom with a modern light stone-look floor preview
Before · illustrative
AI floor preview
1

Capture project intent early

The shopper uploads an indoor or outdoor project photo, establishing immediate buying intent and project context.

2

Route shoppers by selected surface

They choose the surface they want to update, so the experience can move them toward relevant categories and SKUs faster.

3

Convert the catalog into a shortlist

Three suitable products are recommended with product imagery, names, price context, and links back to revenue-generating store actions.

4

Give them a reason to act now

Visual previews reduce hesitation and push shoppers toward the next commercial step: product page, sample, quote, showroom, or checkout.

In-Store Showroom Fit: Works beautifully on showroom tablets and iPads, giving sales associates an interactive tool to walk walk-in customers through material selections using photos of their actual projects.
Example storefront moment

Convert passive browsing into high-intent sales actions

Shoppers on product pages are already close to buying. By letting them preview materials in realistic room environments, RESURFAiCE replaces visual uncertainty with the confidence to request a sample, get a quote, or check out.

Illustrative storefront; example prices are in USD. Product names, currency, and measurement units are tailored to your market.

Midnight Black Tile preview with three material recommendations and illustrative USD pricing per square metre and square foot
Built around your business

Your brand. Your way of selling.

A licensed product with an installed backend and a frontend tailored to your website. We agree the scope before we build.

Fictional storefront concepts—not customer sites. Illustrative products, pricing, and AI previews.

Room base
Analyzing Custom Room Layout
Detecting perspective lines...
Indoor & Outdoor

Designed for any surface, indoors or out.

From interior room lighting to exterior environments, RESURFAiCE handles light reflection and texture scaling on both indoor and outdoor surfaces with equal realism.

Indoor Surfaces
Kitchen floors
Bathroom walls
Countertops
Feature walls
Stairs
Outdoor Surfaces
Patios
Driveways
Facades
Garden paths
Entrances
What your implementation can include

Engineered for high-consideration material sales

Realistic light & scale mapping

AI-driven room rendering automatically adjusts to interior lighting shadows and exterior daylight, maintaining accurate texture scaling for realistic material previews.

Catalog-driven recommendations

Guiding shoppers from uploaded photos to three matching product recommendations, turning passive visual interaction into qualified sales pipeline.

Frictionless browser delivery

Optimized for all modern mobile and desktop browsers with no app downloads, no account setup, and no user instructions required.

Showroom tablet compatibility

Extends your sales counter to showroom iPads, helping sales associates visually guide walk-in customers using photos of their actual homes.

Commercial action hooks

Connects visual previews directly to sample orders, quote forms, and checkout links, capturing buyer interest at the point of decision.

Tailored for surface complexity

Optimized specifically for tiles, slabs, panels, and pavers, accommodating application boundaries and layout orientations.

Tailored B2B demo

See what RESURFAiCE could look like for your business

Send a request and we’ll review your website before getting in touch. In the demo, we’ll discuss your catalog, brand, customer journey, and the scope of a licensed implementation.

Tailored walkthrough: Custom catalog setup, product visualization options, and storefront website integration.
Journey mapping: Move from custom room photos to recommended products, sample requests, and purchases.
Implementation details: Asset requirements, the flat-fee scope, analytics fit, and the path from kickoff to installation.

By submitting, you agree that we may use these details to respond to your request. See our Privacy Policy.